10km of HS2, tracked visit by visit.

EKFB needed a fast, consistent way to document progress across a large and fast-changing section of HS2. HDS delivers bi-weekly drone monitoring of the Calvert section without interrupting live construction.

10kmof HS2 covered each visit
16structures and 3 compounds
1,000+high-resolution images a month
100%safety record

From our annotated HS2 progress film for EKFB.

The challenge

What had to change.

  • A 10km site too large for traditional progress capture
  • Compound layouts and structures changing between visits
  • Stakeholders needing clear, current, structured visual updates
  • Nearby helicopter activity requiring advanced airspace awareness
Our approach

How we delivered it.

  • Drones launched from a slow-moving vehicle to sweep the full 10km while keeping visual line of sight
  • High-resolution stills and 360° video of every key asset on each visit
  • Flights under PDRA-01 at low speed with a visual observer, within EKFB's safety framework
  • ADS-B, acoustic awareness and dynamic home points for safe operation in active airspace
  • Structured uploads to SharePoint so every team can find what it needs
Outcomes

The results.

Improved reporting

All visuals uploaded to SharePoint in a searchable, categorised format.

Rapid turnaround

Edited video reports delivered within hours of each capture session.

Zero disruption

Filming conducted from a moving vehicle, with no site set-up and no interruptions to work.

Safety first

100% visual line of sight, operations aligned with PDRA-01 and EKFB protocols.

Over 1,000 high-resolution images and full video coverage every month, with two structured video reports delivered on time, every time, and a 100% safety record.

Start a project

Set up monitoring for your scheme.

Tell us the site, the visit rhythm and who needs the outputs, and we will plan the routes and price the programme.