Every milestone, evidenced from above.
HDS works on live construction sites every week, monitoring a 10km HS2 section for EKFB and capturing structures work for Kier, delivering the progress records, survey data and quality evidence that keep programmes moving and commercial positions protected.
What construction teams are up against.
Programme visibility
Clients, funders and boards expect current, consistent evidence of progress, assembling it manually burns site team time.
Commercial exposure
Valuations, claims and final accounts turn on what was built when; without dated evidence, it is one word against another.
Survey bottlenecks
Setting-out checks, earthworks measurement and as-builts queue behind scarce survey resource.
Quality records
Covered works generate latent defect risk unless their condition is captured before they disappear.
Inspect, survey, monitor, capture.
Inspect
Structures and temporary works checked in high resolution, plus QA photography of reinforcement, membranes and buried works before cover.
Survey
Earthworks volumes, cut and fill against design, stockpiles and as-built surfaces, measured from the air, aligned to valuation dates.
Monitor
The HS2 model: repeatable capture to a fixed rhythm, structured reports on a fixed day, one searchable record for the whole programme.
Capture
Progress films, completion films and bid imagery from a crew inducted and insured for live sites.
Ready for your procurement checks.
HDS is on live construction sites weekly: CDM awareness, inductions, permits and exclusion zones handled as standard, with a 100% safety record across all programmes.
Request our documentation pack
Specifying drone inspections and surveys
How to scope, procure and integrate drone inspections, surveys and progress monitoring on highways and major infrastructure schemes.
Download the PDFQuestions we get asked.
How does monitoring fit our reporting calendar?
Capture lands on a fixed rhythm aligned to your valuation and reporting dates, bi-weekly on HS2, monthly on most schemes.
Can aerial survey replace some ground survey?
It relieves the bottleneck: earthworks measurement, stockpiles and as-built surfaces from the air, with control agreed with your engineers.
What commercial protection does this give?
Dated, located, comparable records of what was built when, the evidence valuations, EOTs and final accounts rely on.
Will flights disrupt site activity?
No. Capture is planned around site operations, proven across a live 10km HS2 corridor with zero incidents.
Can one visit serve several needs?
Routinely: monitoring, QA capture and marketing content from a single mobilisation.
- CAA Operational Authorisation
- Site-specific RAMS on every job
- GVC and A2 CofC pilots
- CSCS, T1/T2 trained crew
- £10m public and employers liability
- Never over live traffic
Talk to us about your scheme.
Progress records, earthworks volumes, structures and films for your stakeholders: tell us the programme and we will fit around it.