Skip to content Skip to footer
Proven on the UK's biggest railway programme.
Rail · Aerial intelligence for rail infrastructure and major programmes

Proven on the UK's biggest railway programme.

HDS monitors a live 10km section of HS2 for EKFB, 16 structures, bi-weekly capture, a 100% safety record, and brings the same discipline to inspection, survey and monitoring across rail structures, earthworks and lineside assets.

The pressures

What rail teams are up against.

Possession scarcity

Track access is the scarcest resource in rail; every inspection that needs a possession competes with maintenance and renewals for it.

Victorian asset stock

Much of the network's structures and earthworks predate modern records, and condition evidence is expensive to gather by traditional means.

Safety protocols

Working on or near the line carries the industry's most demanding protocols, and every person removed from the trackside is risk designed out.

Programme visibility

Major projects answer to funders, regulators and the public, all expecting consistent, current evidence of progress.

How we help

Inspect, survey, monitor, capture.

Inspect

Structures, earthworks and lineside assets captured without possessions or boots on ballast, in detail trackside inspection cannot match.

Survey

Corridor mapping, embankment surfaces and LiDAR through lineside vegetation, survey data without track access.

Monitor

The HS2 model: repeatable capture to a fixed rhythm across live construction, delivering one searchable record for the whole programme.

Capture

Programme films and milestone photography from a team already inducted into major rail project protocols.

Compliance

Ready for your procurement checks.

HDS works within rail project protocols daily on HS2: inductions, exclusion zones, airspace coordination and site-specific RAMS, with a 100% safety record across the programme.

Request our documentation pack
Specifying drone inspections and surveys (PDF cover)
Free download · Guide for Tier 1 contractors

Specifying drone inspections and surveys

How to scope, procure and integrate drone inspections, surveys and progress monitoring on highways and major infrastructure schemes.

Download the PDF
FAQs

Questions we get asked.

Do you need possessions to capture rail assets?

In most cases, no. Assets are captured from the air under protocols agreed with the infrastructure manager or principal contractor.

What is your rail track record?

Bi-weekly monitoring of a live 10km HS2 section for EKFB: 16 structures, 1,000+ images a month, 100% safety record.

Can you survey vegetated lineside earthworks?

Yes, LiDAR options reach true ground through canopy where imagery cannot.

How do flights coordinate with rail operations?

Through the project's airspace and operational protocols, arranged as part of mobilisation.

Can outputs feed our asset management systems?

Yes, referencing and formats are agreed with your engineers at desktop review.

  • CAA Operational Authorisation
  • Site-specific RAMS on every job
  • GVC and A2 CofC pilots
  • CSCS, T1/T2 trained crew
  • £10m public and employers liability
  • Never over live traffic
Start a project

Talk to us about your route.

Structures, earthworks and stations: tell us the asset and the possession constraints and we will plan the capture around them.