A46 footbridge lift, captured from every angle.
In August 2020 Kier and R&C Williams replaced the Glasshouse footbridge over the A46 near Kenilworth for Highways England. A bridge lift happens once, inside a tightly planned closure, so there is no going back for a missed shot. HDS covered it from the air and the ground.
From our A46 footbridge lift film.
What had to change.
- A single lift inside a fixed closure window, with no chance to reshoot
- A large mobile crane, rigging crews and the span all moving at once
- Covid-19 working rules on site, with restricted numbers and distancing
- Footage needed for the client, the supply chain and the public
How we delivered it.
- Two aircraft: one holding wide establishing shots, one working closer to the lift
- Flights kept clear of open traffic, filming the closed carriageway only
- Ground cameras and a gimbal for interviews and close detail
- A timelapse running through the whole lift
- Edited in-house into a finished film with client branding
The results.
Every stage covered
Arrival, rigging, the lift, landing the span and the finished bridge, all in one film.
Two angles at once
A wide and a close aircraft flying together, so nothing was missed.
Timelapse
Over 2,000 frames turning hours of work into seconds.
Ready to share
A 5-minute film for Kier, R&C Williams and Highways England.
The whole A46 footbridge lift captured from two aircraft and the ground in a single closure, delivered as a finished film and timelapse.
Let us film your work.
Tell us what the film or shoot is for, and we will plan the story, the shots and the edit.